Below are three ready-to-use pieces on the Dhaka Metro Rail for school and college exams: a short paragraph (about 150 words), a longer paragraph (about 250 words) and a composition with headings. Every fact in them is current (November 2026) and checked against DMTCL and news sources, so you will not repeat the old “under construction” lines that many websites still show.
Dhaka Metro Rail: short paragraph (about 150 words)
The Dhaka Metro Rail is the first metro rail of Bangladesh. Its first line, MRT Line 6, runs for 20.1 kilometres on an elevated track from Uttara North to Motijheel and has 16 stations. The first part opened on 28 December 2022, and the full line to Motijheel opened in November 2023. The trains run on electricity, so they do not create smoke on the road. A trip from Uttara to Motijheel takes about 40 minutes, while the same journey by road can take two hours or more in traffic. The fare is between 20 and 100 taka, and passengers with an MRT Pass or Rapid Pass get a 10 percent discount. Every day more than four lakh people use the metro rail. It has saved time, reduced pressure on the roads and made travel safer and more comfortable. The metro rail is a symbol of a modern Dhaka.
Dhaka Metro Rail: paragraph (about 250 words)
Dhaka is one of the most crowded cities in the world, and traffic jams waste millions of working hours here every day. To solve this problem, the government planned a mass rapid transit system, and the Dhaka Metro Rail is the result. It is run by the Dhaka Mass Transit Company Limited (DMTCL). Construction of the first line, MRT Line 6, began in 2016. The line is 20.1 kilometres long and is built on pillars above the road, with 16 stations from Uttara North to Motijheel. Its first section, from Uttara North to Agargaon, opened on 28 December 2022, and the line reached Motijheel in November 2023. The project cost about 33,472 crore taka, and most of the money came as a loan from Japan. The trains were made in Japan and run on electricity. A train comes every five to ten minutes at busy times, and the whole line takes about 40 minutes. Passengers can buy a single journey ticket or use a rechargeable MRT Pass or Rapid Pass, which gives a 10 percent discount. One coach on every train is reserved for women. Today more than four lakh people travel by metro every day, among them students, office workers and patients going to hospitals. The metro has cut travel time, reduced pollution and made journeys safer. More lines, including an underground line to the airport, are being built. If we keep the trains and stations clean and follow the rules, the metro rail will remain a pride of the nation for a long time.
Dhaka Metro Rail: composition with headings
Introduction
For years, the people of Dhaka lost hours every day in traffic. A short trip could take the whole morning. The Dhaka Metro Rail has changed this picture. Since December 2022, a fast electric train has carried people above the crowded roads, and for many people the daily journey has become a matter of minutes instead of hours.
History of the project
The idea of a metro for Dhaka first appeared in the Strategic Transport Plan of 2005. The government approved the project in 2012 and formed the Dhaka Mass Transit Company Limited (DMTCL) in 2013 to build and run it. Construction started in 2016. The Japan International Cooperation Agency (JICA) provided most of the money as a loan, and the total cost came to about 33,472 crore taka.
Route and stations
MRT Line 6 is 20.1 kilometres long and fully elevated. Its 16 stations are Uttara North, Uttara Center, Uttara South, Pallabi, Mirpur 11, Mirpur 10, Kazipara, Shewrapara, Agargaon, Bijoy Sarani, Farmgate, Karwan Bazar, Shahbag, Dhaka University, Bangladesh Secretariat and Motijheel. A 17th station at Kamalapur is under construction. The depot, where the trains are kept and repaired, is at Diabari in Uttara.
Trains, tickets and fares
The line has 24 six-coach trains built in Japan. They run on electricity from overhead wires. Passengers buy a single journey ticket from a machine or counter, or tap a rechargeable MRT Pass or Rapid Pass at the gate. Fares range from 20 to 100 taka, and card users pay 10 percent less. Senior citizens and people with disabilities get a 25 percent discount, and one coach on every train is for women only.
Benefits of the metro rail
- Saves time: Uttara North to Motijheel takes about 40 minutes, a trip that can take two hours or more by road.
- Less pollution: the electric trains produce no smoke on the street and take many cars and buses off the road.
- Safe and comfortable: the trains are air-conditioned, on time and have CCTV, so women, children and older people can travel with confidence.
- Helps the economy: workers reach offices on time, and land and shops near the stations have become more valuable.
- Discipline: queues, ticket gates and clear rules have taught a new travel culture.
Problems and challenges
The metro is not perfect. Trains are very crowded at rush hour, and the line still covers only one part of the city. Ticket income does not yet cover the cost of running the system and repaying the loan. Rickshaws and buses crowd the roads below some stations, and many passengers still need a second vehicle to reach the station.
The future
More lines are being built. MRT Line 1 will be the country’s first underground metro, from the airport to Kamalapur with a branch to Purbachal. MRT Line 5 North will link Hemayetpur with Bhatara through Mirpur and Gulshan, and Line 5 South is planned from Gabtoli to Dasherkandi. Together they will turn Dhaka’s 20 kilometres of metro into a network of about 90 kilometres in the 2030s.
Conclusion
The Dhaka Metro Rail is more than a train. It has shown that Bangladesh can build a modern mass transit system and that people will use it with discipline. If we take care of it as our own property and the new lines are finished on time, the metro rail can free Dhaka from the curse of traffic jams.
Dhaka Metro Rail: key facts at a glance
| Official name | Dhaka Mass Rapid Transit (MRT), Line 6 |
|---|---|
| Operator | Dhaka Mass Transit Company Limited (DMTCL), a government company formed in 2013 |
| First planned | Strategic Transport Plan for Dhaka, 2005 |
| Construction began | 2016 |
| Opened | 28 December 2022 (Uttara North–Agargaon); Agargaon–Motijheel in November 2023 |
| Length and stations | 20.1 km, fully elevated, 16 stations from Uttara North to Motijheel |
| Project cost | About ৳33,472 crore, most of it a loan from Japan (JICA) |
| Trains | 24 six-coach electric trains, built in Japan by Kawasaki and Mitsubishi |
| Depot | Diabari, Uttara |
| Full trip | About 38 minutes, Uttara North to Motijheel |
| Fares | ৳20 to ৳100; 10% off with an MRT Pass or Rapid Pass |
| Passengers | More than 4 lakh a day in 2026 |
Want more detail for a longer answer? See the route map and station list, the official fare chart and the future metro lines.
Tips for a better answer
- Use the right dates. The metro opened on 28 December 2022 and reached Motijheel in November 2023. Old books and websites still say “will open in 2024”.
- Say “MRT Line 6”. It is the first of several planned lines, so naming it shows you know the bigger plan.
- Give one number per point. 20.1 km, 16 stations, about 40 minutes, 4 lakh passengers: examiners like specific facts.
- End with your own view. One sentence on what the metro means for you or your family makes the answer stand out.
Sources
- DMTCL: Metro Rail timetable and fare list
- Wikipedia: Dhaka Metro Rail (history, cost, rolling stock)
- Prothom Alo: Metro rail extension to Kamalapur 85% complete (2026)
- bdnews24: Metro rail ridership (2026)
Frequently asked questions
When did the Dhaka Metro Rail open?
The first section, Uttara North to Agargaon, opened on 28 December 2022. The line was extended to Motijheel in November 2023.
Who runs the Dhaka Metro Rail?
Dhaka Mass Transit Company Limited (DMTCL), a government company formed in 2013 to build and operate the metro lines.
How long is the Dhaka Metro Rail?
MRT Line 6 is 20.1 km long, fully elevated, with 16 stations from Uttara North to Motijheel. A 17th station, Kamalapur, is expected to open in July 2027.
How much did the Dhaka Metro Rail cost?
About ৳33,472 crore for MRT Line 6. Most of the money is a loan from the Japan International Cooperation Agency (JICA).
How many people use the Dhaka Metro every day?
More than 4 lakh (400,000) passengers a day in 2026, with record days close to 5 lakh.
Which country built the metro trains?
Japan. The 24 six-coach trains were built by a Kawasaki and Mitsubishi consortium and shipped to Bangladesh in 2021.
Where is the Dhaka Metro depot?
At Diabari in Uttara, north of Uttara North station. Trains are parked, cleaned and repaired there.